Projects

2018 Ministry of Transportation of Ontario Projects

Hwy 60 Browns Creek Culvert replacement required Goldie Mohr Ltd to install temporary flow bypass system and divert water flow, dewater and excavate, remove existing 2450mm CSP culvert, place granular bedding, install precast cut-off walls on both ends of the culvert, install 2800mm x 2700mm precast box culvert.


  • MTO - Browns Creek

  • IMG_6488