2018 Bilberry Creek Offsetting Habitat
The City of Ottawa Bilberry Creek project is a modification for following instream restoration opportunities / fish habitat enhancement. The above mentioned project includes excavating for a pond that will … Read more
View project »2018 McLachlan Road McNab Braeside
McLachlan Road rehabilitation and reconstruction of approximately 3.3km on McLachlan Road and approximately 0.5km on McLeod Road in Township of McNab Braeside. The work also included ditch grading and the … Read more
View project »2018 Ministry of Transportation of Ontario Projects
Hwy 60 Browns Creek Culvert replacement required Goldie Mohr Ltd to install temporary flow bypass system and divert water flow, dewater and excavate, remove existing 2450mm CSP culvert, place granular … Read more
View project »2018 City of Ottawa Culverts
All City of Ottawa Culvert Replacement Program required Goldie Mohr Ltd to apply our approved dewater plan / erosion and sediment control plan as per MOECC regulations 63/16. Specific tasks … Read more
View project »2018 Culvert Projects
Goldie Mohr Ltd completed various culvert replacements including 6 East Culverts project, CWWE project and west Ottawa project.
View project »2018 City of Ottawa Rehabilitation of Petrie Island Culverts
Rehabilitation of Petrie Island Culverts consist of removing existing culverts, placing tremie concrete, Installing polymer laminated steel plates, placing granulars as per D-029, place distribution slab and fine grade.
View project »2017 Bilberry Creek Slope Repair and Retention
Repair of the slope on the edge of Bilberry Creek that had eroded over time, including erosion control measures.
View project »2017 Braeside Waste Disposal Site Clean Up
Clean up and grubbing of the Waste Site in Braeside (Renfrew County) for site expansion.
View project »2017 Culvert Repairs and Replacement
Goldie Mohr had a big year of culverts in 2017, check out the gallery for just a few of our successful projects!
View project »2013 Construction of Conley Road Bridge
Replace existing culvert, resurface existing road and landscaping.
View project »2013 Berrigan Drive and Longfield Drive Roundabout
Intersection modifications. Transformed a 4 way intersection to a roundabout.
View project »2012 Skyline Complex
Project involved roads & parking lot reconstruction and landscape upgrades for pedestrian safety and infrastructure sustainability.
View project »2012 Walkley Armoury Parking Lot Repaving
Provided labour, material, and equipment necessary for the repaving of the parking lot at Walkley Armoury
View project »Francis Properties – Dunrobin Road
Removals of existing footings, hoist columns and oil tank. Provided excavation and backfill for new building.
View project »University of Ottawa – Parking Lot R Reconstruction
Complete reconstruction of existing parking lot including curb and landscaping.
View project »2013 Construction of Southwest Transitway Tunnel Portal
Excavation, ventilation and fencing.
View project »Hunt Club Noise Wall
Project involves construction of approximately 3.6km of new noise barrier along Hunt Club Road.
View project »Flewellyn Road Bridge Renewal
Replace existing culvert, resurface existing road and landscaping
View project »Lawrence Street and Stone School Road Culvert Replacements
Replace existing culverts, resurface existing road and landscaping.
View project »MTO Kanata Parking Lot Reconstruction, Terry Fox Patrol Yard
Heavy Civil Construction
View project »Russell Road Culvert Upgrade and Replacement
Replacement of the culvert on Russell Road, including ditch grading, and tie in with existing storm system.
View project »Metcalfe Subdivision Storm Pond
Excavation and grading of a new storm retention pond to serve the new development in Metcalfe.
View project »Woodvale Pentecostal Church Parking Lot
Grubbing, grading and excavation, including laying base granulars for the Woodvale Church parking lot expansion.
View project »Kanata Trinity Plaza On-Site Works & Stormwater Management Pond
This project involved site servicing for multiple commercial buildings, excavation/creation of a stormwater management pond. Excavate and backfill for building foundations, construct the parking lot for the new plaza.
View project »Siteworks & Roadway Modifications – Richmond Village Square
Install site services, including a storm water management pond and new turning lanes to provide access to the retail stores.
View project »Kanata North Elementary School
Performed site grading, building excavation, backfilling and site services
View project »Demolition/Deconstruction of 4 East End Properties
Under direction of the NCC we decommissioned and demolished 4 properties located at various areas of the city. All materials were sorted and recycled or disposed of in the proper … Read more
View project »Parking Lot Improvements
This project involved the complete parking lot reconstruction including the excavation, site servicing , aggregate subgrade, asphalt and landscaping.
View project »-
Projects